HUDSONCONSTRUCTION AND REMODELINGGet an estimate
← Our work

COMMERCIAL PROJECT

TJMAX — Warehouse Renovation

Hudson Construction and Remodeling renovated employee and support spaces within the TJMAX warehouse, including office areas, a break room and commercial restrooms. The work shown brings together practical layouts, flooring, tiled walls, sinks, restroom fixtures and interior finishes for everyday workplace use.

This album documents the renovation at different stages, including restroom progress before partitions were installed.

Employee break room: counter space, shelving and wood-look flooring.
Employee break room: counter space, shelving and wood-look flooring.
Office area: meeting space, carpeting and perimeter windows.
Office area: meeting space, carpeting and perimeter windows.
Restroom progress: tiled walls and floors with wall-mounted fixtures, before partitions.
Restroom progress: tiled walls and floors with wall-mounted fixtures, before partitions.
Restroom progress: urinal and toilet installation along the tiled wall.
Restroom progress: urinal and toilet installation along the tiled wall.

Behind the renovation

Browse the earlier conditions and work in progress by area.

Hallways 4 photos
Corridor before renovation, showing the existing floor and wall finishes.
Corridor before renovation, showing the existing floor and wall finishes.
Connecting staff area with existing counters and wall finishes.
Connecting staff area with existing counters and wall finishes.
Hallway work in progress near the entry and staff areas.
Hallway work in progress near the entry and staff areas.
Connecting corridor and interior window during renovation.
Connecting corridor and interior window during renovation.
Bathrooms 5 photos
Restroom work area prepared for renovation.
Restroom work area prepared for renovation.
Existing sink and counter area before replacement.
Existing sink and counter area before replacement.
Fixture removal and demolition at the existing tiled walls.
Fixture removal and demolition at the existing tiled walls.
Restroom work in progress with fixtures removed and materials staged.
Restroom work in progress with fixtures removed and materials staged.
Existing partition area during the restroom renovation.
Existing partition area during the restroom renovation.
Main Room 5 photos
Main staff room before renovation, with existing counters and flooring.
Main staff room before renovation, with existing counters and flooring.
Existing kitchenette cabinets and counter before the updates.
Existing kitchenette cabinets and counter before the updates.
Main room during demolition and preparation.
Main room during demolition and preparation.
Open staff area during renovation, showing circulation between rooms.
Open staff area during renovation, showing circulation between rooms.
Main room work in progress along the window wall.
Main room work in progress along the window wall.
Rooms 5 photos
Office floor preparation before new finishes.
Office floor preparation before new finishes.
Interior room preparation around the service window.
Interior room preparation around the service window.
Existing blue-walled room with flooring removed.
Existing blue-walled room with flooring removed.
Support room with existing flooring and wall-mounted equipment.
Support room with existing flooring and wall-mounted equipment.
Utility room showing existing wall finishes and equipment.
Utility room showing existing wall finishes and equipment.

Planning a warehouse or workplace renovation?

Tell us about your space and the improvements you have in mind.

Request an estimate →

Explore commercial renovation services

Planning the scope? Read our North Jersey tenant fit-out planning checklist for landlord coordination, access and handover questions.